25 Units of S13-3150kVA/33kV Transformers for a Steel Manufacturing Plant in India

Project Overview

HBTP supplied 25 units of S13-3150/33 transformers for an integrated steel plant with blast furnace and rolling mills in Odisha, India. The project represents a significant deployment in the steel manufacturing sector, requiring transformers engineered for reliable operation under demanding conditions.

Project Background

India is the world's second-largest steel producer, and Odisha is a major steel manufacturing hub with abundant iron ore and coal. This integrated plant has a capacity of 3 million tons per year, with blast furnaces, converters, continuous casters, and rolling mills requiring massive, reliable power.

Customer Requirements

33kV/11kV distribution transformers, 3150kVA capacity, multi-stage cooling for variable process loads, design for high harmonic content from furnace and mill drives, high ambient temperature and dust resistance, compliance with IS 2026 (Indian Standard for transformers).

Our Solution

HBTP supplied its S13-series transformers, engineered specifically for steel manufacturing applications. The high-quality CRGO silicon steel core with step-lap mitered joints minimizes no-load losses, while copper windings provide enhanced short-circuit withstand capability and long service life.

Parameter Specification
Model S13-3150/33
Capacity per Unit 3150 kVA
Voltage Ratio 33 / 11 kV
Cooling ONAN/ONAF/OFAF
Efficiency S13
Standard IS 2026 / IEC
Load Furnace + Rolling Mills
Environment High Heat + Dust
Reliability Continuous Process

Quality & Testing

All units passed IS 2026 standard tests including temperature rise, impedance, and dielectric tests. Harmonic load testing verified performance with non-linear furnace and mill drive loads. Multi-stage cooling system performance was verified at each stage.

Delivery & Installation

The 25 units were delivered to the plant in phased shipments matching the construction of various process units. HBTP provided on-site commissioning support during the plant's ramp-up phase.

25
Units Supplied
3M
Tons Steel/Year
IS 2026
IN Standard

Project Outcomes

All 25 transformers were successfully energized and are operating at rated capacity. The project was completed on schedule, and the customer has reported excellent performance with no unplanned outages attributed to transformer equipment. HBTP's reliable power distribution solution has contributed to the project's overall success and operational efficiency.