15 Units of SCB12-2000kVA Dry-Type Transformers for an Enterprise Data Center in Germany

 

Project Overview

HBTP supplied 15 units of SCB12-2000/10 transformers for an enterprise-owned data center for financial services in Frankfurt, Germany. The project represents a significant deployment in the enterprise data center sector, requiring transformers engineered for reliable operation under demanding conditions.

Project Background

Frankfurt is Germany's financial hub and a major data center market. This enterprise data center supports critical financial services operations, requiring Tier III availability with concurrent maintainability. The facility houses the company's primary IT infrastructure and disaster recovery systems.

Customer Requirements

2000kVA capacity, SCB12 efficiency, dry-type F1 fire-resistant construction for indoor installation, smart monitoring sensors for predictive maintenance, compliance with VDE and German BSI IT security standards, and Tier III design with concurrent maintainability.

Our Solution

HBTP supplied its SCB12-series transformers, engineered specifically for enterprise data center applications. The high-quality CRGO silicon steel core with step-lap mitered joints minimizes no-load losses, while copper windings provide enhanced short-circuit withstand capability and long service life.

Parameter Specification
Model SCB12-2000/10
Capacity per Unit 2000 kVA
Voltage Ratio 10 / 0.4 kV
Cooling ANAF
Efficiency SCB12
Standard IEC 60076-11 / VDE
Fire Rating F1
Monitoring Smart Sensors
Availability Tier III

Quality & Testing

All units passed third-party witnessed testing by a TÜV-approved inspection body. Tests included no-load loss, load loss, impedance voltage, temperature rise, and sound level measurements. Smart sensor integration was verified during factory acceptance testing.

Delivery & Installation

The 15 units were delivered in phased shipments to minimize disruption during the data center's live migration. HBTP provided 24/7 on-call support during the critical cutover period.

15
Units Supplied
Tier III
Certification
24/7
Support

Project Outcomes

All 15 transformers were successfully energized and are operating at rated capacity. The project was completed on schedule, and the customer has reported excellent performance with no unplanned outages attributed to transformer equipment. HBTP's reliable power distribution solution has contributed to the project's overall success and operational efficiency.